Close

Notification for Widening, Strengthening and Reconstruction work of Karmatand (on Mohanpur-Karmatand RCD road) to Jural (on SH-18) (total length-12706 km) under Section-19(1) of the Land Acquisition Act 30/2013, Anchal-Borio Gram-Kamugoda

Notification for Widening, Strengthening and Reconstruction work of Karmatand (on Mohanpur-Karmatand RCD road) to Jural (on SH-18) (total length-12706 km) under Section-19(1) of the Land Acquisition Act 30/2013, Anchal-Borio Gram-Kamugoda
Title Date View / Download
Notification for Widening, Strengthening and Reconstruction work of Karmatand (on Mohanpur-Karmatand RCD road) to Jural (on SH-18) (total length-12706 km) under Section-19(1) of the Land Acquisition Act 30/2013, Anchal-Borio Gram-Kamugoda 13/05/2026 View (652 KB)